{"id":20808,"date":"2021-11-19T10:23:00","date_gmt":"2021-11-19T10:23:00","guid":{"rendered":"https:\/\/www.hegemann-reiners.de\/tunnel-alberberg\/"},"modified":"2025-01-28T09:39:50","modified_gmt":"2025-01-28T09:39:50","slug":"tunnel-alberberg","status":"publish","type":"post","link":"https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/","title":{"rendered":"TUNNEL ALBERBERG"},"content":{"rendered":"\n<p><strong>Cli\u00adent:<\/strong> Deut\u00adsche Ein\u00adheit Fern\u00adstra\u00ad\u00dfen\u00adpla\u00adnungs- und \u2011bau GmbH (DEGES)<br><strong>Object:<\/strong> A44 | new sec\u00adtion BA5 | TU Alber\u00adberg | Unhau\u00adsen<br><strong>Period:<\/strong> 2021 to&nbsp;2024<\/p>\n\n<p>The A44 is part of the Ger\u00adman Unity Trans\u00adport Pro\u00adject No. 15: \u201cAuto\u00adbahn A44 Kas\u00adsel \u2014 Eisen\u00adach and A4 Eisen\u00adach \u2014 G\u00f6r\u00adlitz\u201d and is inten\u00added to close a gap in the fede\u00adral high\u00adway net\u00adwork on the Ruhr area \u2014 Kas\u00adsel \u2014 Dres\u00adden axis bet\u00adween the A7 near Kas\u00adsel and the A4 near Wom\u00admen. The com\u00admis\u00adsio\u00adned con\u00ads\u00adtruc\u00adtion sec\u00adtion BA5 has a total length of approx. 9 km east of the town of Son\u00adtra and con\u00adnects to the A4 at the vil\u00adlage of Wom\u00admen. The con\u00adtract is being exe\u00adcu\u00adted in a joint ven\u00adture. The fol\u00adlo\u00adwing struc\u00adtures will be built by AUGUST REINERS Bau\u00adun\u00adter\u00adneh\u00admung&nbsp;GmbH:&nbsp;<\/p>\n\n<p>- Con\u00ads\u00adtruc\u00adtion of the Alber\u00adberg Tun\u00adnel (BW C24\/07T), 2 tubes in clo\u00adsed, semi-open and open con\u00ads\u00adtruc\u00adtion method<br>- Con\u00ads\u00adtruc\u00adtion of the \u201cretai\u00adning wall \u2014 B 400\u201d struc\u00adture (BW C24\/07.1 STW) at the con\u00adnec\u00adtion to the Alber\u00adberg tun\u00adnel<br>- Con\u00ads\u00adtruc\u00adtion of the struc\u00adture \u201cRetai\u00adning wall \u2014 along exit ramp RFB Her\u00adle\u00adshau\u00adsen\u201d (BW C24\/03.3 STW)<br>- Con\u00ads\u00adtruc\u00adtion of the \u201cForst\u00adweg under\u00adpass in Ger\u00adbach\u00ads\u00adgrund\u201d struc\u00adture (BW C24\/04A)<br>- Con\u00ads\u00adtruc\u00adtion of the \u201cbat pas\u00adsage\u201d struc\u00adture (BW C24\/15A)<br>- Con\u00ads\u00adtruc\u00adtion of the \u201cBlan\u00adke\u00adbach KVP B 400 under\u00adpass\u201d struc\u00adture (BW C24\/37)<br>- Con\u00ads\u00adtruc\u00adtion of the \u201cretai\u00adning wall \u2014 Leng\u00adforst\u201d struc\u00adture (BW C24\/13 STW)<br>- Con\u00ads\u00adtruc\u00adtion of ope\u00adra\u00adti\u00adons buil\u00adding, extin\u00adgu\u00adis\u00adhing water basin and pol\u00adlutant reten\u00adtion basin<br>- Con\u00ads\u00adtruc\u00adtion of embank\u00adment pro\u00adtec\u00adtion for tun\u00adnel pre-cuts, retai\u00adning wall \u2014 B 400 (BW C24\/07.1 STW), retai\u00adning wall \u2014 Leng\u00adforst (BW C24\/13 STW) and retai\u00adning wall \u2014 along exit ramp RFB Her\u00adle\u00adshau\u00adsen (BW C24\/03.3 STW).<\/p>\n\n<p><strong>TECHNICAL DATA<\/strong><br><strong>Tun\u00adnel length: <\/strong>1x 508 m (BBW 358 m, HOBW 130 m, OBW 20 m) | 1x 427 m (BBW 300 m, HOBW 107 m, OBW 20 m)<br><strong>Excava\u00adted volume: <\/strong>approx. 72,000 m\u00b3 BBW | approx. 12,000 m\u00b3 HOBW<br><strong>Cross-sec\u00adtion: <\/strong>approx. 100 m\u00b2<br><strong>Instal\u00adled quan\u00adtity of con\u00adcrete: <\/strong>approx. 17,700 m\u00b3 tun\u00adnel | approx. 11,600 m\u00b3 civil engi\u00adnee\u00adring<br><strong>Instal\u00adled quan\u00adtity of steel: <\/strong>approx. 3,200 tons tun\u00adnel | approx. 1,600 tons civil engi\u00adnee\u00adring<br><strong>Instal\u00adled quan\u00adtity of shot\u00adcrete: <\/strong>approx. 13,600 m\u00b3 tun\u00adnel | approx. 2,940 m\u00b3 slope stabilization<\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"519\" height=\"389\" data-id=\"12794\" src=\"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2021\/07\/Alberberg-1-e1656599683758.jpg\" alt=\"Alberberg Tunnel\" class=\"wp-image-12794\" srcset=\"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2021\/07\/Alberberg-1-e1656599683758.jpg 519w, https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2021\/07\/Alberberg-1-e1656599683758-300x225.jpg 300w\" sizes=\"(max-width: 519px) 100vw, 519px\"><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"600\" height=\"450\" data-id=\"12792\" src=\"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2021\/07\/Tunnel-Alberberg.jpg\" alt=\"Alberberg Tunnel\" class=\"wp-image-12792\" srcset=\"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2021\/07\/Tunnel-Alberberg.jpg 600w, https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2021\/07\/Tunnel-Alberberg-300x225.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\"><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"600\" height=\"450\" data-id=\"12793\" src=\"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2021\/07\/Tunnel-Alberberg_.jpg\" alt=\"Alberberg Tunnel\" class=\"wp-image-12793\" srcset=\"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2021\/07\/Tunnel-Alberberg_.jpg 600w, https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2021\/07\/Tunnel-Alberberg_-300x225.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\"><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1500\" height=\"1077\" data-id=\"19527\" src=\"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2024\/09\/Tunnelbau-Alberberg-Baustelle.jpg\" alt class=\"wp-image-19527\" srcset=\"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2024\/09\/Tunnelbau-Alberberg-Baustelle.jpg 1500w, https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2024\/09\/Tunnelbau-Alberberg-Baustelle-300x215.jpg 300w, https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2024\/09\/Tunnelbau-Alberberg-Baustelle-1024x735.jpg 1024w, https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2024\/09\/Tunnelbau-Alberberg-Baustelle-768x551.jpg 768w, https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2024\/09\/Tunnelbau-Alberberg-Baustelle-350x250.jpg 350w\" sizes=\"(max-width: 1500px) 100vw, 1500px\"><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"750\" data-id=\"19528\" src=\"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2024\/09\/IMG_0793_.jpg\" alt class=\"wp-image-19528\" srcset=\"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2024\/09\/IMG_0793_.jpg 1000w, https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2024\/09\/IMG_0793_-300x225.jpg 300w, https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2024\/09\/IMG_0793_-768x576.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\"><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The com\u00admis\u00adsio\u00adned con\u00ads\u00adtruc\u00adtion sec\u00adtion BA5 runs over a total length of approx. 9 km east of the town of Son\u00adtra and con\u00adnects to the A4 at the vil\u00adlage of Wom\u00admen. Among other things, AUGUST REINERS is buil\u00adding the tun\u00adnel its\u00adelf, some retai\u00adning walls and two underpasses.&nbsp;<\/p>\n","protected":false},"author":2,"featured_media":20115,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"wp_typography_post_enhancements_disabled":false,"ocean_post_layout":"","ocean_both_sidebars_style":"","ocean_both_sidebars_content_width":0,"ocean_both_sidebars_sidebars_width":0,"ocean_sidebar":"","ocean_second_sidebar":"","ocean_disable_margins":"enable","ocean_add_body_class":"","ocean_shortcode_before_top_bar":"","ocean_shortcode_after_top_bar":"","ocean_shortcode_before_header":"","ocean_shortcode_after_header":"","ocean_has_shortcode":"","ocean_shortcode_after_title":"","ocean_shortcode_before_footer_widgets":"","ocean_shortcode_after_footer_widgets":"","ocean_shortcode_before_footer_bottom":"","ocean_shortcode_after_footer_bottom":"","ocean_display_top_bar":"default","ocean_display_header":"default","ocean_header_style":"","ocean_center_header_left_menu":"","ocean_custom_header_template":"","ocean_custom_logo":0,"ocean_custom_retina_logo":0,"ocean_custom_logo_max_width":0,"ocean_custom_logo_tablet_max_width":0,"ocean_custom_logo_mobile_max_width":0,"ocean_custom_logo_max_height":0,"ocean_custom_logo_tablet_max_height":0,"ocean_custom_logo_mobile_max_height":0,"ocean_header_custom_menu":"","ocean_menu_typo_font_family":"","ocean_menu_typo_font_subset":"","ocean_menu_typo_font_size":0,"ocean_menu_typo_font_size_tablet":0,"ocean_menu_typo_font_size_mobile":0,"ocean_menu_typo_font_size_unit":"px","ocean_menu_typo_font_weight":"","ocean_menu_typo_font_weight_tablet":"","ocean_menu_typo_font_weight_mobile":"","ocean_menu_typo_transform":"","ocean_menu_typo_transform_tablet":"","ocean_menu_typo_transform_mobile":"","ocean_menu_typo_line_height":0,"ocean_menu_typo_line_height_tablet":0,"ocean_menu_typo_line_height_mobile":0,"ocean_menu_typo_line_height_unit":"","ocean_menu_typo_spacing":0,"ocean_menu_typo_spacing_tablet":0,"ocean_menu_typo_spacing_mobile":0,"ocean_menu_typo_spacing_unit":"","ocean_menu_link_color":"","ocean_menu_link_color_hover":"","ocean_menu_link_color_active":"","ocean_menu_link_background":"","ocean_menu_link_hover_background":"","ocean_menu_link_active_background":"","ocean_menu_social_links_bg":"","ocean_menu_social_hover_links_bg":"","ocean_menu_social_links_color":"","ocean_menu_social_hover_links_color":"","ocean_disable_title":"default","ocean_disable_heading":"default","ocean_post_title":"","ocean_post_subheading":"","ocean_post_title_style":"","ocean_post_title_background_color":"","ocean_post_title_background":0,"ocean_post_title_bg_image_position":"","ocean_post_title_bg_image_attachment":"","ocean_post_title_bg_image_repeat":"","ocean_post_title_bg_image_size":"","ocean_post_title_height":0,"ocean_post_title_bg_overlay":0.5,"ocean_post_title_bg_overlay_color":"","ocean_disable_breadcrumbs":"default","ocean_breadcrumbs_color":"","ocean_breadcrumbs_separator_color":"","ocean_breadcrumbs_links_color":"","ocean_breadcrumbs_links_hover_color":"","ocean_display_footer_widgets":"default","ocean_display_footer_bottom":"default","ocean_custom_footer_template":"","_jetpack_memberships_contains_paid_content":false,"ocean_post_oembed":"","ocean_post_self_hosted_media":"","ocean_post_video_embed":"","ocean_link_format":"","ocean_link_format_target":"self","ocean_quote_format":"","ocean_quote_format_link":"post","ocean_gallery_link_images":"on","ocean_gallery_id":[],"footnotes":""},"categories":[135],"tags":[],"class_list":["post-20808","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tunnel-construction-ongoing","entry","has-media"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>TUNNEL ALBERBERG<\/title>\n<meta name=\"description\" content=\"The construction section runs for a total length of approx. 9 km east of the town of Sontra and connects to the A4 at the village of Wommen.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"TUNNEL ALBERBERG\" \/>\n<meta property=\"og:description\" content=\"The construction section runs for a total length of approx. 9 km east of the town of Sontra and connects to the A4 at the village of Wommen.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/\" \/>\n<meta property=\"og:site_name\" content=\"HEGEMANN-REINERS GRUPPE\" \/>\n<meta property=\"article:published_time\" content=\"2021-11-19T10:23:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-28T09:39:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2020\/07\/AUGUST-REINERS-Tunnel-Alberberg.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"563\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Katja Liebecke\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Katja Liebecke\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/tunnel-alberberg\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/tunnel-alberberg\\\/\"},\"author\":{\"name\":\"Katja Liebecke\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#\\\/schema\\\/person\\\/f021fa0e9700e3973681e21eb4bca95c\"},\"headline\":\"TUNNEL ALBERBERG\",\"datePublished\":\"2021-11-19T10:23:00+00:00\",\"dateModified\":\"2025-01-28T09:39:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/tunnel-alberberg\\\/\"},\"wordCount\":326,\"publisher\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/tunnel-alberberg\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/AUGUST-REINERS-Tunnel-Alberberg.jpg\",\"articleSection\":[\"Tunnel construction Ongoing\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/tunnel-alberberg\\\/\",\"url\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/tunnel-alberberg\\\/\",\"name\":\"TUNNEL ALBERBERG\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/tunnel-alberberg\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/tunnel-alberberg\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/AUGUST-REINERS-Tunnel-Alberberg.jpg\",\"datePublished\":\"2021-11-19T10:23:00+00:00\",\"dateModified\":\"2025-01-28T09:39:50+00:00\",\"description\":\"The construction section runs for a total length of approx. 9 km east of the town of Sontra and connects to the A4 at the village of Wommen.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/tunnel-alberberg\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/tunnel-alberberg\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/tunnel-alberberg\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/AUGUST-REINERS-Tunnel-Alberberg.jpg\",\"contentUrl\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/AUGUST-REINERS-Tunnel-Alberberg.jpg\",\"width\":1000,\"height\":563},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/tunnel-alberberg\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"TUNNEL ALBERBERG\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/\",\"name\":\"HEGEMANN-REINERS GRUPPE\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#organization\",\"name\":\"HEGEMANN-REINERS GRUPPE\",\"url\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/cropped-HR_Gruppe.png\",\"contentUrl\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/cropped-HR_Gruppe.png\",\"width\":1551,\"height\":133,\"caption\":\"HEGEMANN-REINERS GRUPPE\"},\"image\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#\\\/schema\\\/person\\\/f021fa0e9700e3973681e21eb4bca95c\",\"name\":\"Katja Liebecke\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e8ccd14b0a17d84b9aedf1f492fbca9197591c8b2dcf268e6b1a2b6da7b3aa43?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e8ccd14b0a17d84b9aedf1f492fbca9197591c8b2dcf268e6b1a2b6da7b3aa43?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e8ccd14b0a17d84b9aedf1f492fbca9197591c8b2dcf268e6b1a2b6da7b3aa43?s=96&d=mm&r=g\",\"caption\":\"Katja Liebecke\"},\"url\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/author\\\/alexandra\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"TUNNEL ALBERBERG","description":"The construction section runs for a total length of approx. 9 km east of the town of Sontra and connects to the A4 at the village of Wommen.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/","og_locale":"en_US","og_type":"article","og_title":"TUNNEL ALBERBERG","og_description":"The construction section runs for a total length of approx. 9 km east of the town of Sontra and connects to the A4 at the village of Wommen.","og_url":"https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/","og_site_name":"HEGEMANN-REINERS GRUPPE","article_published_time":"2021-11-19T10:23:00+00:00","article_modified_time":"2025-01-28T09:39:50+00:00","og_image":[{"width":1000,"height":563,"url":"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2020\/07\/AUGUST-REINERS-Tunnel-Alberberg.jpg","type":"image\/jpeg"}],"author":"Katja Liebecke","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Katja Liebecke","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/#article","isPartOf":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/"},"author":{"name":"Katja Liebecke","@id":"https:\/\/www.hegemann-reiners.de\/en\/#\/schema\/person\/f021fa0e9700e3973681e21eb4bca95c"},"headline":"TUNNEL ALBERBERG","datePublished":"2021-11-19T10:23:00+00:00","dateModified":"2025-01-28T09:39:50+00:00","mainEntityOfPage":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/"},"wordCount":326,"publisher":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/#organization"},"image":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/#primaryimage"},"thumbnailUrl":"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2020\/07\/AUGUST-REINERS-Tunnel-Alberberg.jpg","articleSection":["Tunnel construction Ongoing"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/","url":"https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/","name":"TUNNEL ALBERBERG","isPartOf":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/#primaryimage"},"image":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/#primaryimage"},"thumbnailUrl":"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2020\/07\/AUGUST-REINERS-Tunnel-Alberberg.jpg","datePublished":"2021-11-19T10:23:00+00:00","dateModified":"2025-01-28T09:39:50+00:00","description":"The construction section runs for a total length of approx. 9 km east of the town of Sontra and connects to the A4 at the village of Wommen.","breadcrumb":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/#primaryimage","url":"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2020\/07\/AUGUST-REINERS-Tunnel-Alberberg.jpg","contentUrl":"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2020\/07\/AUGUST-REINERS-Tunnel-Alberberg.jpg","width":1000,"height":563},{"@type":"BreadcrumbList","@id":"https:\/\/www.hegemann-reiners.de\/en\/tunnel-alberberg\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/www.hegemann-reiners.de\/en\/"},{"@type":"ListItem","position":2,"name":"TUNNEL ALBERBERG"}]},{"@type":"WebSite","@id":"https:\/\/www.hegemann-reiners.de\/en\/#website","url":"https:\/\/www.hegemann-reiners.de\/en\/","name":"HEGEMANN-REINERS GRUPPE","description":"","publisher":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.hegemann-reiners.de\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.hegemann-reiners.de\/en\/#organization","name":"HEGEMANN-REINERS GRUPPE","url":"https:\/\/www.hegemann-reiners.de\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.hegemann-reiners.de\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2022\/07\/cropped-HR_Gruppe.png","contentUrl":"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2022\/07\/cropped-HR_Gruppe.png","width":1551,"height":133,"caption":"HEGEMANN-REINERS GRUPPE"},"image":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.hegemann-reiners.de\/en\/#\/schema\/person\/f021fa0e9700e3973681e21eb4bca95c","name":"Katja Liebecke","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e8ccd14b0a17d84b9aedf1f492fbca9197591c8b2dcf268e6b1a2b6da7b3aa43?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e8ccd14b0a17d84b9aedf1f492fbca9197591c8b2dcf268e6b1a2b6da7b3aa43?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e8ccd14b0a17d84b9aedf1f492fbca9197591c8b2dcf268e6b1a2b6da7b3aa43?s=96&d=mm&r=g","caption":"Katja Liebecke"},"url":"https:\/\/www.hegemann-reiners.de\/en\/author\/alexandra\/"}]}},"jetpack_featured_media_url":"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2020\/07\/AUGUST-REINERS-Tunnel-Alberberg.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/posts\/20808","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/comments?post=20808"}],"version-history":[{"count":2,"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/posts\/20808\/revisions"}],"predecessor-version":[{"id":20812,"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/posts\/20808\/revisions\/20812"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/media\/20115"}],"wp:attachment":[{"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/media?parent=20808"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/categories?post=20808"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/tags?post=20808"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}