{"id":21922,"date":"2026-07-15T08:20:38","date_gmt":"2026-07-15T08:20:38","guid":{"rendered":"https:\/\/www.hegemann-reiners.de\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/"},"modified":"2026-09-29T07:13:41","modified_gmt":"2026-09-29T07:13:41","slug":"hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag","status":"publish","type":"post","link":"https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/","title":{"rendered":"HEGEMANN GMBH AWARDED CONTRACT FOR THE SECOND PHASE OF DRAGING WORK ON THE ELBL\u0104G"},"content":{"rendered":"\n<p class=\"has-text-align-left wp-block-paragraph\">Hege\u00admann GmbH has been awarded the con\u00adtract for the second phase of dred\u00adging work on the Elbl\u0105g River in Pol\u00adand. The cli\u00adent is the Mari\u00adtime Aut\u00adho\u00adrity in Gdy\u00adnia. The pro\u00adject is part of the fourth con\u00ads\u00adtruc\u00adtion phase for the expan\u00adsion of the water\u00adway bet\u00adween the Vis\u00adtula Lagoon (Zalew Wi\u015blany) and the Bay of Gda\u0144sk. The goal is to deepen the navi\u00adga\u00adtion chan\u00adnel to a con\u00adsis\u00adtent depth of five meters, ther\u00adeby impro\u00adving navi\u00adga\u00adtion con\u00addi\u00adti\u00adons on the Elbl\u0105g River.&nbsp;<\/p>\n\n<p class=\"wp-block-paragraph\">The new con\u00ads\u00adtruc\u00adtion phase covers appro\u00adxi\u00adm\u00adately 7.45 kilo\u00adme\u00adters bet\u00adween the Fri\u00adsches Haff and Point P1 near Elbl\u0105g. The work is being car\u00adried out by HEGEMANN GmbH in col\u00adla\u00adbo\u00adra\u00adtion with its Dutch part\u00adner, Van den Herik Kus\u00adten Oever\u00adwer\u00adken B.V. The dred\u00adging work is being car\u00adried out while ship\u00adping traf\u00adfic con\u00adti\u00adnues, pla\u00adcing high demands on plan\u00adning and execution.&nbsp;<\/p>\n\n<p class=\"wp-block-paragraph\">As part of the over\u00adall pro\u00adject, archaeo\u00adlo\u00adgi\u00adcal inves\u00adti\u00adga\u00adti\u00adons and mea\u00adsu\u00adres for envi\u00adron\u00admen\u00adtal pro\u00adtec\u00adtion and nature con\u00adser\u00adva\u00adtion are also planned.<\/p>\n\n<p class=\"has-text-align-left wp-block-paragraph\">With this new con\u00adtract, HEGEMANN GmbH is taking on its share of the work to expand the water\u00adway on the Elbl\u0105g River. We app\u00adre\u00adciate the trust our cli\u00adent has pla\u00adced in us and look for\u00adward to suc\u00adcessfully imple\u00admen\u00adting this chal\u00adlen\u00adging pro\u00adject tog\u00ade\u00adther with our partner.&nbsp;<\/p>\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>July 2026<\/p>\n","protected":false},"author":2,"featured_media":21923,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"wp_typography_post_enhancements_disabled":false,"ocean_front_end_style_editor":"no","ocean_post_layout":"","ocean_both_sidebars_style":"","ocean_both_sidebars_content_width":0,"ocean_both_sidebars_sidebars_width":0,"ocean_sidebar":"","ocean_second_sidebar":"","ocean_disable_margins":"enable","ocean_add_body_class":"","ocean_shortcode_before_top_bar":"","ocean_shortcode_after_top_bar":"","ocean_shortcode_before_header":"","ocean_shortcode_after_header":"","ocean_has_shortcode":"","ocean_shortcode_after_title":"","ocean_shortcode_before_footer_widgets":"","ocean_shortcode_after_footer_widgets":"","ocean_shortcode_before_footer_bottom":"","ocean_shortcode_after_footer_bottom":"","ocean_display_top_bar":"default","ocean_display_header":"default","ocean_header_style":"","ocean_center_header_left_menu":"","ocean_custom_header_template":"","ocean_custom_logo":0,"ocean_custom_retina_logo":0,"ocean_custom_logo_max_width":0,"ocean_custom_logo_tablet_max_width":0,"ocean_custom_logo_mobile_max_width":0,"ocean_custom_logo_max_height":0,"ocean_custom_logo_tablet_max_height":0,"ocean_custom_logo_mobile_max_height":0,"ocean_header_custom_menu":"","ocean_menu_typo_font_family":"","ocean_menu_typo_font_subset":"","ocean_menu_typo_font_size":0,"ocean_menu_typo_font_size_tablet":0,"ocean_menu_typo_font_size_mobile":0,"ocean_menu_typo_font_size_unit":"px","ocean_menu_typo_font_weight":"","ocean_menu_typo_font_weight_tablet":"","ocean_menu_typo_font_weight_mobile":"","ocean_menu_typo_transform":"","ocean_menu_typo_transform_tablet":"","ocean_menu_typo_transform_mobile":"","ocean_menu_typo_line_height":0,"ocean_menu_typo_line_height_tablet":0,"ocean_menu_typo_line_height_mobile":0,"ocean_menu_typo_line_height_unit":"","ocean_menu_typo_spacing":0,"ocean_menu_typo_spacing_tablet":0,"ocean_menu_typo_spacing_mobile":0,"ocean_menu_typo_spacing_unit":"","ocean_menu_link_color":"","ocean_menu_link_color_hover":"","ocean_menu_link_color_active":"","ocean_menu_link_background":"","ocean_menu_link_hover_background":"","ocean_menu_link_active_background":"","ocean_menu_social_links_bg":"","ocean_menu_social_hover_links_bg":"","ocean_menu_social_links_color":"","ocean_menu_social_hover_links_color":"","ocean_disable_title":"default","ocean_disable_heading":"default","ocean_post_title":"","ocean_post_subheading":"","ocean_post_title_style":"","ocean_post_title_background_color":"","ocean_post_title_background":0,"ocean_post_title_bg_image_position":"","ocean_post_title_bg_image_attachment":"","ocean_post_title_bg_image_repeat":"","ocean_post_title_bg_image_size":"","ocean_post_title_height":0,"ocean_post_title_bg_overlay":0.5,"ocean_post_title_bg_overlay_color":"","ocean_disable_breadcrumbs":"default","ocean_breadcrumbs_color":"","ocean_breadcrumbs_separator_color":"","ocean_breadcrumbs_links_color":"","ocean_breadcrumbs_links_hover_color":"","ocean_display_footer_widgets":"default","ocean_display_footer_bottom":"default","ocean_custom_footer_template":"","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"page_builder":"","_jetpack_memberships_contains_paid_content":false,"ocean_post_oembed":"","ocean_post_self_hosted_media":"","ocean_post_video_embed":"","ocean_link_format":"","ocean_link_format_target":"self","ocean_quote_format":"","ocean_quote_format_link":"post","ocean_gallery_link_images":"on","ocean_gallery_id":[],"footnotes":""},"categories":[130],"tags":[],"class_list":["post-21922","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news","entry","has-media"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>CONTRACT FOR THE SECOND PHASE OF DRAGLINE WORK ON THE ELBL\u0104G<\/title>\n<meta name=\"description\" content=\"Hegemann GmbH has been awarded the contract for the second phase of dredging work on the Elbl\u0105g River in Poland. The client is the Maritime Authority in Gdynia. The project is part of the fourth construction phase aimed at expanding the waterway between the Vistula Lagoon (Zalew Wi\u015blany) and the Bay of Gda\u0144sk. The goal is to deepen the navigation channel to a consistent water depth of five meters, thereby improving navigation conditions on the Elbl\u0105g River. The new construction phase covers approximately 7.45 kilometers between the Vistula Lagoon and Point P1 near Elbl\u0105g. The work is being carried out by HEGEMANN GmbH in collaboration with its Dutch partner, Van den Herik Kusten Oeverwerken B.V. The dredging work is taking place while vessel traffic continues, placing high demands on both planning and execution.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CONTRACT FOR THE SECOND PHASE OF DRAGLINE WORK ON THE ELBL\u0104G\" \/>\n<meta property=\"og:description\" content=\"Hegemann GmbH has been awarded the contract for the second phase of dredging work on the Elbl\u0105g River in Poland. The client is the Maritime Authority in Gdynia. The project is part of the fourth construction phase aimed at expanding the waterway between the Vistula Lagoon (Zalew Wi\u015blany) and the Bay of Gda\u0144sk. The goal is to deepen the navigation channel to a consistent water depth of five meters, thereby improving navigation conditions on the Elbl\u0105g River. The new construction phase covers approximately 7.45 kilometers between the Vistula Lagoon and Point P1 near Elbl\u0105g. The work is being carried out by HEGEMANN GmbH in collaboration with its Dutch partner, Van den Herik Kusten Oeverwerken B.V. The dredging work is taking place while vessel traffic continues, placing high demands on both planning and execution.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/\" \/>\n<meta property=\"og:site_name\" content=\"HEGEMANN-REINERS GRUPPE\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-15T08:20:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-29T07:13:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2026\/07\/IMG_0999.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1536\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Katja Liebecke\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Katja Liebecke\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\\\/\"},\"author\":{\"name\":\"Katja Liebecke\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#\\\/schema\\\/person\\\/f021fa0e9700e3973681e21eb4bca95c\"},\"headline\":\"HEGEMANN GMBH AWARDED CONTRACT FOR THE SECOND PHASE OF DRAGING WORK ON THE ELBL\u0104G\",\"datePublished\":\"2026-07-15T08:20:38+00:00\",\"dateModified\":\"2026-09-29T07:13:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\\\/\"},\"wordCount\":218,\"publisher\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/IMG_0999.webp\",\"articleSection\":[\"Latest news\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\\\/\",\"url\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\\\/\",\"name\":\"CONTRACT FOR THE SECOND PHASE OF DRAGLINE WORK ON THE ELBL\u0104G\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/IMG_0999.webp\",\"datePublished\":\"2026-07-15T08:20:38+00:00\",\"dateModified\":\"2026-09-29T07:13:41+00:00\",\"description\":\"Hegemann GmbH has been awarded the contract for the second phase of dredging work on the Elbl\u0105g River in Poland. The client is the Maritime Authority in Gdynia. The project is part of the fourth construction phase aimed at expanding the waterway between the Vistula Lagoon (Zalew Wi\u015blany) and the Bay of Gda\u0144sk. The goal is to deepen the navigation channel to a consistent water depth of five meters, thereby improving navigation conditions on the Elbl\u0105g River. The new construction phase covers approximately 7.45 kilometers between the Vistula Lagoon and Point P1 near Elbl\u0105g. The work is being carried out by HEGEMANN GmbH in collaboration with its Dutch partner, Van den Herik Kusten Oeverwerken B.V. The dredging work is taking place while vessel traffic continues, placing high demands on both planning and execution.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/IMG_0999.webp\",\"contentUrl\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/IMG_0999.webp\",\"width\":2048,\"height\":1536,\"caption\":\"Contract Signing in Elblag\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/hegemann-reiners-group\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"HEGEMANN GMBH AWARDED CONTRACT FOR THE SECOND PHASE OF DRAGING WORK ON THE ELBL\u0104G\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/\",\"name\":\"HEGEMANN-REINERS GRUPPE\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#organization\",\"name\":\"HEGEMANN-REINERS GRUPPE\",\"url\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/cropped-HR_Gruppe.png\",\"contentUrl\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/cropped-HR_Gruppe.png\",\"width\":1551,\"height\":133,\"caption\":\"HEGEMANN-REINERS GRUPPE\"},\"image\":{\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/#\\\/schema\\\/person\\\/f021fa0e9700e3973681e21eb4bca95c\",\"name\":\"Katja Liebecke\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e8ccd14b0a17d84b9aedf1f492fbca9197591c8b2dcf268e6b1a2b6da7b3aa43?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e8ccd14b0a17d84b9aedf1f492fbca9197591c8b2dcf268e6b1a2b6da7b3aa43?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e8ccd14b0a17d84b9aedf1f492fbca9197591c8b2dcf268e6b1a2b6da7b3aa43?s=96&d=mm&r=g\",\"caption\":\"Katja Liebecke\"},\"url\":\"https:\\\/\\\/www.hegemann-reiners.de\\\/en\\\/author\\\/alexandra\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CONTRACT FOR THE SECOND PHASE OF DRAGLINE WORK ON THE ELBL\u0104G","description":"Hegemann GmbH has been awarded the contract for the second phase of dredging work on the Elbl\u0105g River in Poland. The client is the Maritime Authority in Gdynia. The project is part of the fourth construction phase aimed at expanding the waterway between the Vistula Lagoon (Zalew Wi\u015blany) and the Bay of Gda\u0144sk. The goal is to deepen the navigation channel to a consistent water depth of five meters, thereby improving navigation conditions on the Elbl\u0105g River. The new construction phase covers approximately 7.45 kilometers between the Vistula Lagoon and Point P1 near Elbl\u0105g. The work is being carried out by HEGEMANN GmbH in collaboration with its Dutch partner, Van den Herik Kusten Oeverwerken B.V. The dredging work is taking place while vessel traffic continues, placing high demands on both planning and execution.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/","og_locale":"en_US","og_type":"article","og_title":"CONTRACT FOR THE SECOND PHASE OF DRAGLINE WORK ON THE ELBL\u0104G","og_description":"Hegemann GmbH has been awarded the contract for the second phase of dredging work on the Elbl\u0105g River in Poland. The client is the Maritime Authority in Gdynia. The project is part of the fourth construction phase aimed at expanding the waterway between the Vistula Lagoon (Zalew Wi\u015blany) and the Bay of Gda\u0144sk. The goal is to deepen the navigation channel to a consistent water depth of five meters, thereby improving navigation conditions on the Elbl\u0105g River. The new construction phase covers approximately 7.45 kilometers between the Vistula Lagoon and Point P1 near Elbl\u0105g. The work is being carried out by HEGEMANN GmbH in collaboration with its Dutch partner, Van den Herik Kusten Oeverwerken B.V. The dredging work is taking place while vessel traffic continues, placing high demands on both planning and execution.","og_url":"https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/","og_site_name":"HEGEMANN-REINERS GRUPPE","article_published_time":"2026-07-15T08:20:38+00:00","article_modified_time":"2026-09-29T07:13:41+00:00","og_image":[{"width":2048,"height":1536,"url":"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2026\/07\/IMG_0999.jpeg","type":"image\/jpeg"}],"author":"Katja Liebecke","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Katja Liebecke","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/#article","isPartOf":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/"},"author":{"name":"Katja Liebecke","@id":"https:\/\/www.hegemann-reiners.de\/en\/#\/schema\/person\/f021fa0e9700e3973681e21eb4bca95c"},"headline":"HEGEMANN GMBH AWARDED CONTRACT FOR THE SECOND PHASE OF DRAGING WORK ON THE ELBL\u0104G","datePublished":"2026-07-15T08:20:38+00:00","dateModified":"2026-09-29T07:13:41+00:00","mainEntityOfPage":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/"},"wordCount":218,"publisher":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/#organization"},"image":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/#primaryimage"},"thumbnailUrl":"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2026\/07\/IMG_0999.webp","articleSection":["Latest news"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/","url":"https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/","name":"CONTRACT FOR THE SECOND PHASE OF DRAGLINE WORK ON THE ELBL\u0104G","isPartOf":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/#primaryimage"},"image":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/#primaryimage"},"thumbnailUrl":"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2026\/07\/IMG_0999.webp","datePublished":"2026-07-15T08:20:38+00:00","dateModified":"2026-09-29T07:13:41+00:00","description":"Hegemann GmbH has been awarded the contract for the second phase of dredging work on the Elbl\u0105g River in Poland. The client is the Maritime Authority in Gdynia. The project is part of the fourth construction phase aimed at expanding the waterway between the Vistula Lagoon (Zalew Wi\u015blany) and the Bay of Gda\u0144sk. The goal is to deepen the navigation channel to a consistent water depth of five meters, thereby improving navigation conditions on the Elbl\u0105g River. The new construction phase covers approximately 7.45 kilometers between the Vistula Lagoon and Point P1 near Elbl\u0105g. The work is being carried out by HEGEMANN GmbH in collaboration with its Dutch partner, Van den Herik Kusten Oeverwerken B.V. The dredging work is taking place while vessel traffic continues, placing high demands on both planning and execution.","breadcrumb":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/#primaryimage","url":"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2026\/07\/IMG_0999.webp","contentUrl":"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2026\/07\/IMG_0999.webp","width":2048,"height":1536,"caption":"Contract Signing in Elblag"},{"@type":"BreadcrumbList","@id":"https:\/\/www.hegemann-reiners.de\/en\/hegemann-gmbh-awarded-contract-for-the-second-phase-of-draging-work-on-the-elblag\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/www.hegemann-reiners.de\/en\/hegemann-reiners-group\/"},{"@type":"ListItem","position":2,"name":"HEGEMANN GMBH AWARDED CONTRACT FOR THE SECOND PHASE OF DRAGING WORK ON THE ELBL\u0104G"}]},{"@type":"WebSite","@id":"https:\/\/www.hegemann-reiners.de\/en\/#website","url":"https:\/\/www.hegemann-reiners.de\/en\/","name":"HEGEMANN-REINERS GRUPPE","description":"","publisher":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.hegemann-reiners.de\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.hegemann-reiners.de\/en\/#organization","name":"HEGEMANN-REINERS GRUPPE","url":"https:\/\/www.hegemann-reiners.de\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.hegemann-reiners.de\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2022\/07\/cropped-HR_Gruppe.png","contentUrl":"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2022\/07\/cropped-HR_Gruppe.png","width":1551,"height":133,"caption":"HEGEMANN-REINERS GRUPPE"},"image":{"@id":"https:\/\/www.hegemann-reiners.de\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.hegemann-reiners.de\/en\/#\/schema\/person\/f021fa0e9700e3973681e21eb4bca95c","name":"Katja Liebecke","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e8ccd14b0a17d84b9aedf1f492fbca9197591c8b2dcf268e6b1a2b6da7b3aa43?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e8ccd14b0a17d84b9aedf1f492fbca9197591c8b2dcf268e6b1a2b6da7b3aa43?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e8ccd14b0a17d84b9aedf1f492fbca9197591c8b2dcf268e6b1a2b6da7b3aa43?s=96&d=mm&r=g","caption":"Katja Liebecke"},"url":"https:\/\/www.hegemann-reiners.de\/en\/author\/alexandra\/"}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/www.hegemann-reiners.de\/wp-content\/uploads\/2026\/07\/IMG_0999.webp","_links":{"self":[{"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/posts\/21922","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/comments?post=21922"}],"version-history":[{"count":2,"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/posts\/21922\/revisions"}],"predecessor-version":[{"id":21925,"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/posts\/21922\/revisions\/21925"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/media\/21923"}],"wp:attachment":[{"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/media?parent=21922"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/categories?post=21922"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hegemann-reiners.de\/en\/wp-json\/wp\/v2\/tags?post=21922"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}