You are currently viewing SECONDARY SCHOOL IN THE PARK

SECONDARY SCHOOL IN THE PARK

Loca­tion: Bre­men
Time­frame: 2024 to 2026
Cate­gory: Turn­key Con­s­truc­tion | Public-Pri­vate Part­ner­ship (PPP)
Cli­ent: Spe­cial Fund for Real Estate and Tech­no­logy of the City of Bre­men
Archi­tect: Gruppe GME Archi­tek­ten BDA

The expan­sion of the Ober­schule im Park marked the suc­cessful and timely com­ple­tion of a chal­len­ging con­s­truc­tion pro­ject. In an excep­tio­nally short total con­s­truc­tion period of just two years, a stan­da­lone, two-story exten­sion with an addi­tio­nal base­ment level was built. 

The exten­sive spe­cia­li­zed civil engi­nee­ring work alone took about a year. This makes the sub­se­quent con­s­truc­tion period all the more remar­kable: Only 16 months were available for the struc­tu­ral work and turn­key finishing—an ambi­tious sche­dule that was suc­cessfully met. 

The buil­ding com­bi­nes various func­tions under one roof. The three-court gym is loca­ted in the base­ment and extends onto the ground floor. All tech­ni­cal rooms are also housed in the base­ment. In addi­tion to the gym, the ground floor fea­tures modern spe­cia­li­zed class­rooms. The upper floor fea­tures three spa­cious clus­ter areas, each assi­gned to a spe­ci­fic grade level. 

A spe­cial archi­tec­tu­ral high­light and, at the same time, the cen­ter­piece of the upper floor is the “Green Class­room”: A land­scaped cour­ty­ard crea­tes a shel­te­red out­door space and brings light and a plea­sant atmo­sphere right into the heart of the building.

Archi­tec­tu­rally, the exten­sion has a wel­co­ming, bright, and modern appearance. Gene­rous win­dow areas pro­vide ple­nty of natu­ral light, while red clin­ker brick and a warm woo­den facade create a har­mo­nious and invi­ting appearance. The result is a modern lear­ning and living space that com­bi­nes func­tion­a­lity, archi­tec­ture, and a plea­sant atmosphere.