In the Braunschweig-Wolfsburg Research Airport industrial park, we carried out the pipeline construction work for the district heating distribution and building connection lines at the Hermann-Blenk-Straße property on behalf of Braunschweiger Netz GmbH (BS|NETZ). The project involved the construction of an approximately 259-meter-long KMR DN 125/225 distribution line to ensure supply to the western section of the site, as well as an approximately 63-meter-long KMR DN 80/160 building service line leading to the heating plant.
Special challenges arose from the project’s location on the heavily trafficked Hermann-Blenk-Straße, which included an underpass, multiple construction phases, traffic safety measures, utility line protection, and close coordination with traffic authorities, the fire department, utility providers, and concurrent construction projects. Thanks to precise execution and coordinated construction processes, utility connections for the new building were installed properly.